Measure touches instead of guessing
Count one real day before you estimate. The number recalled from memory may not equal observed workflow volume.
Same math as the operator post
Pick the quiet one. Double entry. Status copied into a tracker. A draft rewritten after the model said it was done. Four inputs, 48 working weeks, 1.3 loaded rate.
Annual cost = touches × (minutes ÷ 60) × rate × 1.3 × people × 48. Under $3,000, leave it alone.
Count one real day before you estimate. The number recalled from memory may not equal observed workflow volume.
Nobody files a ticket for the copy between two systems. Everyone accepted it years ago. That is why it survives.