Skip to main content
Noetfield Systems Inc.

Same math as the operator post

What is this process costing you?

Pick the quiet one. Double entry. Status copied into a tracker. A draft rewritten after the model said it was done. Four inputs, 48 working weeks, 1.3 loaded rate.

One minute

Annual cost = touches × (minutes ÷ 60) × rate × 1.3 × people × 48. Under $3,000, leave it alone.

People undercount touches by about half

Count one real day before you estimate. The number you type from memory is usually the complaint, not the work.

The expensive leaks are the quiet ones

Nobody files a ticket for the copy between two systems. Everyone accepted it years ago. That is why it survives.